Metroekt’s viability: traffic flows are designed

«Academic» — traffic flows are designed

According to the projects, the transverse profiles of roads and the streets of the Academician district were developed when taking into account the width of the carriageways, which are designed to increase the level of motorization by exceeding the estimated period (up to 2025.). With special attention, entrance nodes are being worked out in the area-the interchanges of Deryabina-Onufrieva, Onufrieva-Chkalova, Onufrieva-Amundsen.

Training flows were calculated in the areas of the movement “from the city to Academic” and “from Academic to the city” to the evening and morning hours of peak, their correspondence of the throughput of the leading main roads of the Academic region was analyzed. The number of vehicles (by 2020.) moving to the «academic» and from it, it will presumably amount to 7400 units. In the evening, about 85% of the total volume of cars passing in the morning peak in the morning, as many people linger at work or go to the shops will move there during the watch.

In addition to Yekaterinburg, the Academician direct message with other settlements will be absent, and transit transport will not go to the area in this regard. In addition, the closest to the new district of ul. Onufrieva will serve as one of the exits to the Yekaterinburg-Perm-Moscow highway, and the Ekad, which will describe the new area from the southwest side, will calmly travel to the federal highways of Yekaterinburg-Tyumen and Yekaterinburg-Chelyabinsk, as well as to the Koltsovo Airport.

According to experts, in general, the cost of designing and building roads of the 1st stage of the Academic region will be about 14 billion. rubles, taking into account driveways inside quarters (2.5 km) and trunk streets (29.5 km). On the financial resources allocated by the state, they began to build two sections of the road along the street. WITH.Deryabina 1.58 km long. At the end of 2007. The amount is 150 million. rub., provided for 2007., fully mastered. The project participates in the competition for the allocation of funds from the federal budget in 2008. for the construction of roads in the Academic region for 1056 million. rub. In 2008. To ensure co -financing the project from the budget of Yekaterinburg, 260 million was allocated. rub.