Before you start repairing in the apartment, it is necessary to carry out a number of preparatory work — remove all the furniture, remove old wallpaper, clean the walls and ceiling from paint and plaster, other finishing materials. After that, it is necessary to dismantle door blocks, flooring and partitions if you need.
Upon completion of the preparatory stage, they begin the black decoration. First, all communications are replaced — heating and water supply systems, electrical wiring, ventilation system. After that, it is necessary to draw up a repair plan, having previously studied the prices for apartment renovation (price list), as well as purchase the materials necessary for subsequent work.
Before performing the finishing, all the walls, ceilings and floors should be leveled, replace window structures. Then the prepared ceilings and walls are treated with a primer, strengthened with a galvanized mesh and putty — the surfaces should be perfectly even. After that, you need to install sockets and switches, paint the ceiling.
At the final stage, finish painting of the ceiling is performed, after which you can start finishing the walls of the walls with decorative plaster, paint, ceramic tiles or wallpaper. After the completion of these works, doors, radiators, lamps, air conditioners, electrical panels and other decorative elements are installed.
After the repair in the apartment, there is a lot of construction garbage, which must be assembled, taken out and conducted general cleaning. And only then can owners take up the arrangement of furniture and interior design.