Construction technology, using reinforced panels of non -removable formwork, has a number of undeniable qualities that positively affect the economy of such works. First of all, this is the lack of need for lifting and other heavy construction equipment. The most difficult details are freely tolerated and manually mounted by the forces of two workers. Reinforced panel, 1 x 3 m in size of only 27 kg.
Shipbuilding Modified Concrete, used for the construction of walls by fragmentation on the formwork panel, is made directly at the construction site, using a conventional solution of the solution.
The autonomy of work at the construction site, due to the use of materials and equipment not related to external supplies, the lack of dependence on specialized equipment, allow us to optimize the production of work, which significantly affects the total duration of their implementation.
The brigade, of four workers and foreman, builds a monolithic two -story building with an area of 250 — 300 meters, depending on complexity, in 30 — 45 days.
The minimum impact on the landscape, in the area of the construction site, reduces the costs of its restoration after completion of work.