One of the main roles in the process of arranging brick and stone buildings is given to reinforced concrete jumper. Various types of these structural elements are widely used in the process of erecting civil buildings. They are installed in those places where very large loads are planned.
This means that jumper should be as strong as possible. And for this reason they are made from reinforced concrete. At the same time, these elements themselves are called block, although they, of course, have nothing to do with wood. Be that as it may, qualitatively made reinforced concrete jumpers are not afraid of any loads.
It is only necessary to choose the right dimensions of this element. They depend on what the calculated load parameters. On their basis, such parameters as the length of the reinforced concrete jumper for masonry are selected, also the required amount of reinforcement in it.
The load that some jumpers can withstand is up to 3700 kg/m, which can be called an incredibly high result. The installation process of reinforced concrete jumpers is quite complicated. Therefore, in order for the result to be of high quality, good specialists are required.