Before laying tiles, you need to prepare the surface. It must be cleaned of dust and treated with a primer. We start work from the far wall from the corner. Previously, markings should be made under the first row in order to avoid a wedge -shaped trim near the walls if possible. When you apply glue for 2-3 tiles, draw a gear spatula along the solution. There are such tiles on which separately it will also be necessary to apply the solution. These include thick tiles with relief from the wrong side. The tile is put on a layer of solution and slightly pressed with small rotational movements.
It is not necessary to rotate or move the tile pressed to the solution so that the solution does not fall on the edges of the seams and does not clog them. At the beginning of work, especially in the front row, you must use the level of a level to check each laid tile. All tiles should be located at the same height. Be sure to pay attention to tile colors. After all, even in one batch there can be various shades. Try to combine them beautifully. To separate the surface areas, there are various boundary tiles, as well as decorative elements. Their location should be thought out in advance. The grout of the seams is produced only after the entire surface is lined.