During the construction of any building, there is a need to lay communications. They are cable, wired and pipe. The manufacturability of the laying of communication lines in buildings under construction using the Pencounton «Offesbia» is very high. All communications can be placed inside the frame, before filling the insulation.
All pipe lines, both small and large diameter, are strengthened inside the frame, are excreted for its dimensions in the places of connection of the final devices or in special switching cabinets and niches.
After installation, pipelines are tested for density. Tested pipelines are freed from water, plugs are installed on them, in order to avoid clogging during construction and finishing work.
Cable and wired lines can be laid using plastic electrical pipes, also located and fixed inside the frame of the building. For the possibility of laying additional cable-wire lines in the future, electrical pipeline channels are equipped with rotary passage elements. They are placed between the switching cabinets, distribution boxes and in places of possible connection of consumers.
It is allowed to use other methods and technologies for laying communications. It is necessary to provide access to maintaining places of switching and connection.