Like any work in the construction industry, fundamental work requires careful preparation. First of all, it is necessary to prepare the site, which is supposed to build. To do this, carry out the following operations: cut a layer of soil with vegetation, pour a hole and cut all the tubercles. If the project of your future building is at your fingertips, then immediately mark his plan. You have very little left — to start and place all the necessary building materials. As for the marking of the structure plan, it involves the transfer from the drawing and fixing the main parameters and the size of the axes and the foundation on the construction site. Marking is preceded by the installation of castes from the pillars that need to be fixed by burying in the ground.
The clasp from the pillars should be stirred at a distance of two meters from the proposed structure. The next step in the preparatory work is attaching to fixed pillars (parallel to the walls of the structure) of rails or boards, on which the required dimensions of the pit, and then the foundation and walls are subsequently, make marks in the subsequent. Keep in mind that pits and trenches dig to a depth of no more than a meter, using fasteners and spacers. This will prevent the soil sprinkling.