First you need to mark the ceiling using a pencil, as well as the level. It should be borne in mind that the distance between the profiles should be about twenty centimeters. This arrangement will hide the wires, as well as other elements. After that, you can install guide elements, which can be fixed using dowels. The suspensions must be placed on the previously applied lines, the distance between which should be about 35-40 centimeters.
During operation, it is necessary to constantly check whether all the details are located exactly. In order to do this, you can use the level. After the supporting frame is prepared, you can proceed to the installation of drywall sheets. They must be checked in a checkerboard. In this case, the distance between these elements should not exceed a pair of millimeters. In this case, the structure will not prevent air circulation.
In order to fix the sheets, you can use self -tapping screws, having them with a certain step. Joints can be filled with a special composition. If you plan to strengthen the structure, you can use the reinforcing grid.