Laying channels for engineering communications

When laying communications in houses built from three -layer heat -efficient blocks “Teplost”, a chatting tool is used.

For attaching pipe channels to the walls, pistols can be used to shoot clamps with dowels. When fixing, using clogging dowels, a manual electric punch is used to drill holes in the block. Using a hand hammer, a plastic filler is inserted and dowel.

All communications, in the building from the Teplosten three -layer block, is convenient to place in the space between the laying of the wall and the drywall of the interior decoration of the room. In the case when the diameter of the pipe line exceeds the specified clearance, you can cut the depressions in the blocks in order to hide the specified line in the gypsum plasterboard. In this case, for cutting the canal in the concrete part of the unit, a grinder with a diamond circle (for concrete) and a manual electric punch is used to remove the carved concrete layer.

When attaching communications to the wall, using screwed screws, a screwdriver is used.

The heat engineering calculation of the heating system of the house should take into account the required temperature regime, design features of the walls, floors and roofs, the number of residents as consumers of hot water. Based on the calculation, the necessary equipment and the scheme of its installation are determined.