As practice shows, the replacement or installation of internal doors almost always takes away much more means, time and effort than was supposed at the planning stage. Therefore, it is better to be prepared to solve this problem and know about existing subtleties.
The acquisition and installation of interior doors compared to redevelopment or plumbing work is often a simple event. On the other hand, often many questions arise related to the installation of acquired doors and each of them requires an answer.
If you started a major overhaul, then the doors should be purchased only after the finishing work related to plaster and whitewashing. If you have already bought doors, but something went wrong-do not rush to cut the canvas and box. You can easily spoil the door, but even if you do not spoil it, it will affect its appearance and strength. Better find a check and try to agree on an exchange.
Of course, all the doors, not excluding the input, must observe a single style. This is achieved in different ways: you can install several doors at once: outside — metal, from the inside — the inner door. True, such a design will be somewhat hacking. However, there is a more optimal option: complete with internal doors at the same time order the finishing panel.